Workshop: “Critical Pathways in English Studies, Truant Geographies: Masculinities and Gender in Transition in Post-War Sri Lankan Culture, Language and Society”

Workshop: “Critical Pathways in English Studies, Truant Geographies: Masculinities and Gender in Transition in Post-War Sri Lankan Culture, Language and Society”

A Workshop titled “Critical Pathways in English Studies, Truant Geographies: Masculinities and Gender in Transition in Post-War Sri Lankan Culture, Language and Society” was held from 26th– 29th March 2018 at the Goethe Institute, Colombo 7. The Workshop was attended by Dr. Benedict Heller from Justus Liebig University, Giessen and Prof. Stefan Horlacher from TU, Dresden as well as the faculty of the Department of English. During the workshop, Prof. Stefan Horlacher conducted a session on Masculinities and Dr. Benedikt Heller conducted a training session on using the software, R to conduct research.

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *